Welcome to the official website of Shandong Yushun Pipeline Engineering Co., Ltd.!

Tel:  (0)16536933666

Copyright©Shandong Yushun Pipeline Engineering Co., Ltd.   All rights reserved   鲁ICP备19005518号 

Welcome to inquire!

Add:Zhubao Industrial Zone, Lanshan District,

          Linyi City, Shandong Province


Tel:(0)13869900096

WeChat

scan it

More exciting waiting for you!

>
>
>
PE pipe PPR pipe docking method

News Detail

PE pipe PPR pipe docking method

[Abstract]:
If they are connected by hot-melt connection, they can be directly heated and connected. In fact, this method is wrong, and there is no two pinch strength, and the quality of the project.
  If they are connected by hot-melt connection, they can be directly heated and connected. In fact, this method is wrong, and there is no two pinch strength, and the quality of the project.        
  The correct connection method should be connected by flanges. Small-diameter pipes can also be connected with toothed fittings, so as to effectively ensure the connection strength and ensure the quality of the project.      

NEWS

relevant information

No content information display available
Please add data record on website background.
I want to make a comment
Have
Net friends participating in discussion
Message delivered
全部评论
Reviews
No content information display available
Please add data record on website background.