PE pipe PPR pipe docking method
Release time:
Jan 24,2019
If hot-melt connection is adopted, it can be directly heated for connection. In fact, this method is wrong, and there is no pinch strength. The correct connection method for engineering quality should be flange connection. Small-diameter pipes can also be connected with fittings with teeth, so as to effectively guarantee the connection strength and ensure the engineering quality.
The Importance and Advantages of PE Pipe in Water Supply Project
2023-10-04
2023-09-24
PE pipe manufacturers how to choose? Shandong water pipe recommended
2023-09-14
Shandong Yushun Pipeline Engineering Co., Ltd.
Telephone:+86-539-8014668
Mobile:+86-13665490806
QQ:294168678
Address: Zhubao Industrial Park, Lanshan District, Linyi City, Shandong Province