Home
About Us
Enterprise Profile
Appearance of the factory
Products
PE drag pipe, pipe jacking
PE threading pipe
PE farmland irrigation pipe
PE steel wire mesh skeleton pipe
PE water supply pipe
PE drain pipe
PE siphon drain pipe
MPP Power Sleeve
HDPE double-wall corrugated pipe
PE gas pipe
Engineering pipeline
PE pipe fittings
PE Electrofusion Fittings
White PE pipe
Case
News
Company News
Industry dynamics
Contact Us
Online consultation
+8613665490806
Language
中文简体
中文繁體
English
日本語
한국인
Français
Deutsch
Follow us and learn more News.
Detailed classification of pe polyethylene pipe
The detailed classification of pe polyethylene pipes is divided into outdoor water supply pipes, building water supply pipes, building drainage pipes, buried drainage pipes, gas pipes, electrical casing pipes, agricultural pipes, industrial pipes, hot water heating pipes, sewage pipes, etc. According to material density: high density polyethylene pipe, medium density polyethylene pipe, low density polyethylene pipe; According to material classification: PE100, PE80, PE63, PE40, PE32; According to structure: smooth wall polyethylene pipe, double wall corrugated pipe, spiral winding pipe, etc. According to the material: cross-linked polyethylene pipe, aluminum-plastic composite pipe, copper-plastic composite pipe, steel-plastic composite pipe, etc.
11
2019
/
Precautions for laying polyethylene coil
Precautions for laying polyethylene coil pipes 1. Pipe laying shall be carried out after the elevation of trench bottom and the quality inspection of pipe foundation are qualified. Before laying pipes, pipes and fittings shall be inspected again. Pipes and fittings found to have problems shall not be used. 2. The thickness of soil covering the top of the pipe under the roadway shall not be less than 0.7rru 4. When the pipe groove is excavated manually, the bottom of the groove shall be flat, dense and free of sharp objects. The bottom of the trench may be undulated, but the pipe must be smoothly supported. If there is over excavation, it must be backfilled and compacted. During mechanical excavation, 200mm allowance shall be reserved at the bottom of the design groove, which shall be cleaned manually. 5. Laying
07
What are the standards when the pipeline is laid and backfilled?
(1) When open ditch is used for drainage, the drainage ditch shall be kept unblocked without water in the trench. When well point dewatering is used, the dynamic water level shall be kept below the bottom of the trench no less than 500mm<> (2) The backfill shall be filled to a sufficient degree to prevent the pipeline from floating due to water recharge outside the trench. (3) The backfill soil on both sides of the pipeline and within 500mm above the top of the pipeline shall not contain gravel, bricks, frozen soil and other miscellaneous hard objects. (4) The backfill soil shall be tamped in layers. The thickness of each layer is shown in Table 1. The compaction tools shall be paved with wood rammer, iron rammer 20 frog rammer and fire rammer 20-50 pressure.
03
The action essentials of removing the support after the pe pipe hot melt
1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people. 2. When removing the formwork, a warning area must be set up and someone must be assigned to monitor it. Formwork removal must be thoroughly removed, and no suspended formwork shall be retained. The removed formwork shall be cleaned in time and stacked neatly. The removed formwork and support shall be transported to the ground with vertical lifting equipment, and no littering shall be allowed.
01
What is the prospect of installing and using PE pipes
With the continuous development of society, high cost performance, high quality and low price PE pipe in our life is more and more widely used, because the price of PE pipe is not very high, so we often ignore the identification of PE pipe quality, leading us to buy back inferior PE pipe, so how to identify the quality of PE pipe is good or bad. First of all, after we get the PE pipe, we should first check the surface smoothness of the PE pipe to make the most preliminary identification. Then we should drop the sample to check whether the PE pipe is a high calcium product. The high calcium product is easy to break. However, if the price of the PE pipe is reasonable and meets our production needs, we should choose it.
28
10
Standard for trench bottom of pipeline excavation
Pipe excavation trench bottom standard single pipe laying trench bottom width a = D 0.3m double pipe laying trench bottom width a = Dl D2 S 0.3m general provisions for laying 75
27
Electric hot melt pipe fittings construction matters needing attention
Matters needing attention in the construction of electric hot melt pipe fittings a, electric hot melt pipe fittings: electric hot melt pipe fittings are arranged on the inner surface of pipe fittings by a certain method. during construction, the electric hot wire in the pipe fittings is electrified and heated with a special heating control power supply to melt and combine the contact surfaces of the pipe fittings and the pipe fittings. after cooling, the pipe fittings and the pipe fittings are firmly and sealingly combined. Due to the fast and convenient construction and good welding effect, electric hot melt pipe fittings are the most widely used polyethylene pipe fittings in the world. A disadvantage of such tubes is the relatively high manufacturing costs. Electric hot melt pipe fittings construction precautions each manufacturer generally use unique
18
PE water supply pipe network to meet the practical application requirements
Pe water supply pipe network should meet the demand of practical application 1) lay out the pipe network according to the plan of city planning. when laying out, the possibility of construction of water supply system by stages should be considered, and there should be enough room for development. this part of design mainly considers the development of industry and population in the near and long term of the city to design the pipeline layout. 2) The layout of the pipe network must ensure the safety and reliability of water supply. When an accident occurs in the local pipe network, the water cut-off range should be minimized. 3) The pipeline is arranged in the whole water supply area to ensure that users have sufficient water and water pressure; 4) Strive to lay pipelines in the shortest distance to reduce the cost of pipe network and water supply energy. 3, pipeline longitudinal temperature change
09
WeChat
Shandong Yushun Pipeline Engineering Co., Ltd.
Telephone:+86-539-8014668
Mobile:+86-13665490806
QQ:294168678
Address: Zhubao Industrial Park, Lanshan District, Linyi City, Shandong Province
©2023 Shandong Yushun Pipeline Engineering Co., Ltd. SEO
Powered by www.300.cn