Home
About Us
Enterprise Profile
Appearance of the factory
Products
PE drag pipe, pipe jacking
PE threading pipe
PE farmland irrigation pipe
PE steel wire mesh skeleton pipe
PE water supply pipe
PE drain pipe
PE siphon drain pipe
MPP Power Sleeve
HDPE double-wall corrugated pipe
PE gas pipe
Engineering pipeline
PE pipe fittings
PE Electrofusion Fittings
White PE pipe
Case
News
Company News
Industry dynamics
Contact Us
Online consultation
+8613665490806
Language
中文简体
中文繁體
English
日本語
한국인
Français
Deutsch
Follow us and learn more News.
Precautions for construction and installation of PE water supply pipe
1. pipe groove excavation 1. The pipe groove excavation should be straight line, and the groove bottom excavation width is DN 0.30m. When the pipeline is connected underground, the width of the groove bottom at the interface shall be appropriately increased, and the width of the groove bottom of the pipeline shall not be less than DN 0.50m to facilitate the installation and docking. 2. When the pipeline is buried, the minimum pipe top covering depth shall meet the following requirements: ① When buried under the roadway, it shall not be less than 0.80m. When buried under the sidewalk, it should not be less than 0.60m. 3. When the design depth is not reached across the carriageway, steel casing shall be laid for protection. 4. When the pipe groove must be turned, the turning angle should not be used.
28
2019
/
11
The action essentials of removing the support after the pe pipe hot melt
1. Before the formwork support is removed, the concrete strength must meet the design requirements and can only be carried out after being declared and approved. Demolition of the template is generally done with a long pry, and people are not allowed to stand on the template being dismantled. When dismantling the floor template, attention should be paid to the fall of the whole template, especially when the qualitative template is used as the platform template, more attention should be paid to prevent the template from suddenly falling and hurting people. 2. When removing the formwork, a warning area must be set up and someone must be assigned to monitor it. Formwork removal must be thoroughly removed, and no suspended formwork shall be retained. The removed formwork shall be cleaned in time and stacked neatly. The removed formwork and support shall be transported to the ground with vertical lifting equipment, and no littering shall be allowed.
01
What is the prospect of installing and using PE pipes
With the continuous development of society, high cost performance, high quality and low price PE pipe in our life is more and more widely used, because the price of PE pipe is not very high, so we often ignore the identification of PE pipe quality, leading us to buy back inferior PE pipe, so how to identify the quality of PE pipe is good or bad. First of all, after we get the PE pipe, we should first check the surface smoothness of the PE pipe to make the most preliminary identification. Then we should drop the sample to check whether the PE pipe is a high calcium product. The high calcium product is easy to break. However, if the price of the PE pipe is reasonable and meets our production needs, we should choose it.
10
Standard for trench bottom of pipeline excavation
Pipe excavation trench bottom standard single pipe laying trench bottom width a = D 0.3m double pipe laying trench bottom width a = Dl D2 S 0.3m general provisions for laying 75
27
Electric hot melt pipe fittings construction matters needing attention
Matters needing attention in the construction of electric hot melt pipe fittings a, electric hot melt pipe fittings: electric hot melt pipe fittings are arranged on the inner surface of pipe fittings by a certain method. during construction, the electric hot wire in the pipe fittings is electrified and heated with a special heating control power supply to melt and combine the contact surfaces of the pipe fittings and the pipe fittings. after cooling, the pipe fittings and the pipe fittings are firmly and sealingly combined. Due to the fast and convenient construction and good welding effect, electric hot melt pipe fittings are the most widely used polyethylene pipe fittings in the world. A disadvantage of such tubes is the relatively high manufacturing costs. Electric hot melt pipe fittings construction precautions each manufacturer generally use unique
18
PE water supply pipe network to meet the practical application requirements
Pe water supply pipe network should meet the demand of practical application 1) lay out the pipe network according to the plan of city planning. when laying out, the possibility of construction of water supply system by stages should be considered, and there should be enough room for development. this part of design mainly considers the development of industry and population in the near and long term of the city to design the pipeline layout. 2) The layout of the pipe network must ensure the safety and reliability of water supply. When an accident occurs in the local pipe network, the water cut-off range should be minimized. 3) The pipeline is arranged in the whole water supply area to ensure that users have sufficient water and water pressure; 4) Strive to lay pipelines in the shortest distance to reduce the cost of pipe network and water supply energy. 3, pipeline longitudinal temperature change
09
Flexible socket connection method and steps for PE water supply pipe
The socket-type flexible connection of polyethylene pipe is a new type of connection developed with reference to the principle of socket-type flexible connection of cast iron and polyvinyl chloride pipe (pvc-u). It is a PE pipe end welded with a reinforced polyethylene socket. Socket-type flexible connection is to directly insert one end of PE pipe into the special socket of pipe or pipe fitting, press against drawing through the locking ring in the socket, and press the rubber sealing ring to seal, so as to achieve the purpose of connecting pipe and pipe fitting. Pipe PE flexible socket connection steps are as follows ①: cut the pipe according to the required length, and the end face of the cut pipe should be perpendicular to the pipe axis; ②: remove the cut end face
23
What is the welding temperature requirement for hot melt pipe of PE water supply pipe?
PE water supply pipes are divided into low-density PE pipes, medium-density PE pipes, high-density PE pipes, and ultra-high molecular weight PE pipes according to materials. The welding methods and heating temperatures used for different pipes are different. Small diameter or thin wall with socket way, and hot melt PPR pipe is the same, but the heating temperature is different. Low density 160 degree, medium density 190 degree, high density and ultra high molecular weight with 210-decorative knowledge 235 degree. Large diameter requires a special hot melt machine, which is basically divided into 160, 250, 315, 450 and 630 models. Docking (that is, pipes and pipes are directly melted and connected) can also use electricity.
21
WeChat
Shandong Yushun Pipeline Engineering Co., Ltd.
Telephone:+86-539-8014668
Mobile:+86-13665490806
QQ:294168678
Address: Zhubao Industrial Park, Lanshan District, Linyi City, Shandong Province
©2023 Shandong Yushun Pipeline Engineering Co., Ltd. SEO
Powered by www.300.cn